Mesilla Levee Segment Phase 2

Reconstruction of approximately 19 miles of the existing Mesilla Levee Segment along the Rio Grande.  Scope of work included approximately 730,000 CY of earthwork to construct a 2-foot thick clay cap over the existing levee, extending several drainage, concrete structures, installing Waterman sluice and flap gates and almost 80,000 LF of toe drain system with geotextile fabric.