This project consisted of site demolition, installation of two 40-ton truck scales within structural concrete pit foundations, over 6900 SF of concrete approach slab, a 24 ft cantilever crash gate...
This $344K project consisted of installing a new 600 KW generator, an 800 AMP Automatic Transfer Switch, and a new Service Entrance Section at an existing medical facility. As the existing controls for the generator annunciator panel were located within an active medical clinic...